Identify storage and sanitation as different equipment
Grundy County’s published construction-storage provisions address containers used for building supplies and equipment. They include conditions for their contents and access. Ask the project professional which current requirements apply to the actual parcel; do not treat a storage-container decision as approval for a restroom, or apply storage rules to a cabin without that review.
Preserve working access to both installations
Show the toilet provider where the approved storage container will stand and how its doors will be used. A restroom placed in the only available gap may interfere with access to the stored materials. Have the site manager and suppliers coordinate their operating spaces, with workers able to reach toilets without standing in an unloading area.
Keep changes and collection instructions separate
If materials are moved into storage or the container is removed, review the remaining toilet and washing need independently. Do not cancel sanitation simply because another temporary item leaves the site. Give each supplier its own confirmed instructions. The published code is a reference with a current-legislation caveat; obtain the applicable property decision and request a Grundy County equipment assessment without assuming county-wide delivery or a particular permit outcome.
Questions before you book
Does permission for a construction storage container also approve the toilet position?
Do not assume so. Identify each installation and its function to the responsible property professional, then have the suppliers review their separate operating access.